This project comprised the construction of a new community centre on the Island of Guernsey.

CDC were appointed to provide a full design and detailed specification of both the mechanical and electrical elements of the project.  This included producing fully co-ordinated and detailed drawings and liaising with all members of the design team and the client to ensure that the contract ran as smoothly as possible.

Low surface temperature radiators were utilised together with perimeter trench heating to offset downdraughts from full height windows. Energy efficient heat reclaim ventilation has been installed to all function rooms to ensure fresh air requirements are met while under full occupancy. Low energy LED lighting was used throughout to ensure energy consumption was kept to a minimum.